Nottinghamshire School

Project Client: Nottinghamshire County Council
Project Class: Small Project
Project Time Frame: 6 Weeks

A Council project to build a New Extension and complete classroom refurbishments on an existing school during the summer holidays. This project was very tight on time, as all the works and to be finished before school started back in September. The Extension works were land locked and small man driven machinery had to be used to ferry materials back and forth from wagon drops, including earth removal. Comprehensive modernisation to the Head teachers office, reception area, Toilet Facilities and Safe Room. Brickwork was a Black and white design with recessed mortar, with aluminium sash windows. Extensive works were carried out to the existing school roof to upgrade to meet current regulations, New Solar Powered Dome Installed and fed back to the Mains.  New Retaining walls, Outside Drainage, Landscaping and Tarmac were all installed.