Nottinghamshire Restaurant

Project Client: Private Client Project Class: Medium Project Project Time Frame: 6 Weeks A Commercial project to refurbish an existing restaurant utilising a night shift working schedule to allow the restaurant to be open during normal business hours. This work had to be planned in stages so that the works could be carried out each night […]
View Project

Derbyshire School

Project Client: Derbyshire County Council Project Class: Small Project Project Time Frame: 20 Weeks A School project to build a new Extension in keeping with the original Stone building. Welsh Slate Roof, New Playground Area, Internal School Refurbishments to create a new Head Office and Reception for members of the public. M&E to Extension which lead […]
View Project

Nottinghamshire Medical Centre

Project Client: NHS Project Class: Medium Project Project Time Frame: 6 Months A NHS Pharmacy and Surgery Project. New Build Pharmacy Building to Include Drug Storage and Office spaces on the First floor and Shop Floor on the Ground. Major refurbishment throughout the existing surgery (working in live environment including night shifts) Sound Proofing, IPS Sanitary Packs, […]
View Project

Private Residence Derbyshire

Project Client: Private Client Project Class: Medium Project Project Time Frame: 12 Months A Private residence for a Derbyshire Family. New Build 2 floor Executive House, Steel Frame with Brick and Block. Designer Kitchen, Underfloor Heating and Temperature Management system throughout, Solar Panels and Air Source Heat Pump, Smart Velux, Floating Glass Staircase, Wireless Lighting and Socket Control. […]
View Project

Morrisons Local

Project Client: Morrisions Project Class: Medium Project Project Time Frame: 26 Weeks A Commercial project to design and build a 5000 square ft. commercial unit for Morrision’s  The site was an existing Public House and under separate negotiation an end terraced house and surrounding land was also used. The building was built with a steel frame with block […]
View Project

Derbyshire Apartments

Project Client: Private Client Project Class: Large Project Project Time Frame: 8 Months A Commercial Project to design and build 12 1/2 Bed Apartments (split over two buildings)  – Complete refurbishment back to internal walls, all levels and floors rebuilt  including steel work & underpinning. Existing Slate roof carefully dismantled and height of building raised, roof re-instated […]
View Project

Nottinghamshire School

Project Client: Nottinghamshire County Council Project Class: Small Project Project Time Frame: 6 Weeks A Council project to build a New Extension and complete classroom refurbishments on an existing school during the summer holidays. This project was very tight on time, as all the works and to be finished before school started back in September. The Extension […]
View Project

Welbeck Estates

Project Client: Welbeck Estates Project Class: Large Project Project Time Frame: 12 Months A Commercial project, BREAAM Assessed and Funded by the European Commission – Old Stable Block – Basic Shell retained and complete Modernisation to create 6 Clean Environment Spaces for Commercial Use. Ecology and wildlife had to be protected, Existing Brewery Live Site had to […]
View Project

Executive House Derbyshire

Project Client: Private Client Project Class: Medium Project Project Time Frame: 18 Months A Private Executive Home Extension and complete refurbishment of the upper and lower floors. Very High Spec throughout, New Swimming Pool, Balcony Roof Terrace, BiFold Doors (upper and lower) Designer Kitchen and Bathrooms. New Roof, Curtain Walling, Exposed Timbers (stressed to Age) Oak Skirting and […]
View Project

Sainsbury’s Local

Project Client: Private Client Project Class: Large Project Project Time Frame: 9 months A commercial project to design and build 3 commercial units for Sainsbury’s, kennel gate, and a local veterinary. The site was an existing petrol station and convenience store which needed demolishing and the petrol tanks removing from the ground. Contamination was an […]
View Project